[摘要]
为了加强自身对工程建设流程的了解以及对正规化的招投标进行掌握,拟作此招标文件。毕业设计包含烟台中冠印丝的拟招标文件,即工程量的计算、标底的确定、招标文件的编写。招标文件的内容主要包括招标工程的概括情况,招标方的建设意向以及建设规模,招标方对投标方得资质要求、技术要求、工期要求、质量要求等。本工程采用工程量清单(Bill Of Quantity)计价基础,工程量清单说明主要是招标人解释拟招标工程的工程量清单的编制依据以及重要作用,结算时的工程量应以招标人或由其授权委托的监理工程师核准的。招标文件同时也规定了中标后的建设施工合同的主要条款和各式要求,本招标文件对投标的流程有着严格符合业内规范的限制。根据本文件,认为招投标过程复杂,但是具有完整地执行标准和各级规范,与其他行业相比,具有完全不同的特点。在招投标的过程中,容易产生的问题是执行中的纰漏。
关键词:招标流程 工程量清单 合同梗概
[Abstract] In order to strengthen oneself bids to the engineering construction flow understanding as well as to the standardized move carries on grasps, works modelled after this tender document. The graduation project contains in Yantai the crown India silk to plan the tender document, namely resilience computation, minimum acceptable bid determination, tender document compilation. The tender document content mainly includes the tender project the broad situation, the tender side construction intention as well as the construction scale, the tender side to bids the side to result in the intelligence request, the specification, the time limit for a project request, the quality requirement and so on. This project uses the resilience detailed list (Bill Of Quantity) to count the price foundation, the resilience detailed list showed mainly is tenders the person to explain plans to tender the project resilience detailed list establishment basis as well as the vital role, time the settlement resilience should tender the person or oversees engineer by its authorized request to approve. At the same time the tender document had also stipulated is selected the after construction turn-key contract main provision and various types request, this tender document to the flow which bids has strictly the tallying industry in standard limit. According to this document, thought incurs the tender procedure to be complex, but has completely carries out standard and the all levels of standards, compares with other professions, has the completely different characteristic. In incurs in the process which bids, is easy the question which produces is in the execution careless mistake
Key words:The tender flow Bill Of Quantity contract outline
下载全文: