文化广场主体工程施工组织设计
泰达市民文化广场位于天津开发区第一大街以南,新城西路以东地块内,四面环路北起第一大街,西至新城西道,南邻津塘3 号路,东至新城东路,在地块南侧连接轻轨东站,地基现状为预留空地。本工程为酒店、商场、写字楼、美食、娱乐为一体综合性高层民用建筑,建筑物南北向324m,东西向114m,主塔楼14 层,基层为7 层,夹层1层,地下一层。建筑面积地上138943m2 ,总建筑面积179890m2 。
剖面层高:地下一层4.8m,一层~五层6.0m,六楼半夹层3.3m,六层6.6m,七层~十二层3.3m,十三层3.6m,十四层坡顶(室内屋顶花园)。建筑物总高度87m,(幕墙物架高度109m)。
目 录
表 1 施工组织设计文字说明
第一章 综合说明···················································1-16
1 施工技术能力
2 编制说明···················································2-4
3 工程概况···················································5-12
4 施工部署···················································13-16
第二章 设备、人员动员周期和设备、人员、材料运到施工场地的方法·····17-20
1 机械设备进场计划···········································17-18
2 劳动力计划·················································18-19
3 材料进场计划···············································19-20
第三章 主要工程项目施工方法及质量保证措施·························21-77
1 测量方案···················································21-23
2 基础工程、观光通道工程施工方案及质量保证措施···············24-35
3 基础排水和防止沉降措施······································36
4 地下管线、地上设施、周围建筑保护措施························37
5 主体结构主要施工方法及质量保证措施··························38
6 装修工程施工方案···········································58-59
7 防水工程施工方案···········································60-64
8 各种管道、线路等非主体结构工程施工方法及质量保证措施·······65-75
9 采用新技术、新工艺、新材料及专利技术·······················76-77
第四章 管理办法及措施·············································78
1 施工进度保证措施···········································78-111
2 冬雨期施工措施·············································79-83
3 施工工序协调措施···········································84
4 工程项目管理办法及体系框图·································85-88
5 保证安全施工措施及体系框图·································89
6 保证工程质量管理措施及体系框图·····························90-100
7 现场文明施工措施···········································101
8 施工现场环保措施···········································102-103
9 施工现场维护措施···········································104
10 总包管理及服务措施·········································105-107
11 工程交工后服务措施·········································108-111
表2 施工总平面布置图··································112
表3 主要分项工程施工工艺框图··························112
表4 施工进度计划······································112