参考文献是学术论文的根系,是学术论文不可或缺的组成部分,以下是小编搜集整理的论文参考文献范例,欢迎阅读查看。

  参考文献一:

  [1]王革华,田雅林,袁婧婷.能源与可持续发展[M].化学工业出版社,北京,2005.

  [2]朱祚云,孙健刚,毕毓良等.风力发电对上海电网的影响[J].供用电,2007,24(4):5-8.

  [3]RonanD,EleanorD,MarkO'.Systemoperationwithasignificantwindpowerpenetration[C].IEEEPowerEngineeringSocietyGeneralMeeting,Denver,2004.

  [4]HolttinenH.TheimpactoflargescalewindfarmintegrationinNordiccountries[D].Espoo,Finland:HelsinkiUniversity,2004.

  [5]HolttinenH.HourlywindpowervariationsintheNordiccountries[J].WindEnergy,2005,8(2):173-195.

  [6]RonanD,MarkO.Anewapproachtoquantifyreservedemandinsystemswithsignificantinstalledwindcapacity[J].IEEETransonPowerSystems,2005,20(2):587-595.

  [7]孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.

  [8]李强,袁越,李振杰,等.考虑峰谷电价的风电–抽水蓄能联合系统能量转化效益研究[J].电网技术,2009,33(6):13-18.

  [9]雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89.

  [10]戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展[J].电网技术,2007,31(20):16-23.

  [11]HolttinenH.ImpactofhourlywindpowervariationsonsystemoperationintheNordiccountries[J].WindEnergy,2005,8(2):197-218.

  [12]HadiB,LuoChangling,BoonTO.Impactsofwindpowerminute-to-minutevariationsonpowersystemoperation[J].IEEETransonPowerSystems,2008,23(1):150-160.

  [13]FrerisL,InfieldD.Renewableenergyinpowersystems[M].Chester:AJohnWiley&Sons,Ltd,Publication,2008:27-33.

  [14]陈树勇,戴慧珠,白晓民,等.风电场的发电可靠性模型及其应用[J].中国电机工程学报,2000,20(3):26-29.

  [15]庞峰.电力电量平衡新方法[J].水力发电学报,2001,20(4):117-123.

  [16]马光文,王黎.水电站群在电力系统中工作位置的确定[J].水力发电学报,1992,11(1):39-46.

  [17]吴东平,万永华.日电力电量平衡的余荷逐次后移法[J].水力发电学报,1994,13(3):31-36.

  [18]蔡建章,蔡华祥,洪贵平.电力电量平衡算法研究与应用[J].云南电力技术,1994,3:8-12.

  [19]衣立东,朱敏奕,魏磊,姜宁,于广亮.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132.

  [20]李茜,刘天琪,李兴源.大规模风电接入的电力系统优化调度新方法[J].电网技术,2012,36(0):1-8.

  [21]莫若慧.海南电网水火电联合调峰方法与应用研究[D].华中科技大学,2010.

  [22]李付强,王彬,涂少良,等.京津唐电网风力发电并网调峰特性分析[J].电网技术,2009,33(18):128-132.

  [23]张宏宇,印永华,申洪,等.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31.

  [24]张宏宇,印永华,申洪,等.基于序贯蒙特卡洛方法的风电并网系统调峰裕度评估[J].电力系统自动化,2012,36(1):32-37.

  [25]吴淳.风电对电力系统调频和备用的影响研究[J].华东电力,2011,39(6):993-996.

  [26]于达仁,郭钰锋.一次调频的随机过程分析[J].中国电机工程学报,2002,22(6):38-41.

  [27]于达仁,郭钰锋.电网一次调频能力的在线估计[J].中国电机工程学报,2004,24(3):72-76

  [28]熊观佐.互联系统分析与运行[M].北京:水利电力出版社.1995.

  [29]KothariML,NandaJ,KoathariDP,etal.Discrete-modeAutomaticGenerationControlofaTwo-areaReheatThermalSystemwithNewAreaControlError[J].IEEETransonPowerSystems,1989,10(5):730-738.

  [30]孟祥萍,薛昌飞,张化光.多区域互联电力系统的PI滑模负荷频率控制[J].中国电机工程学报,2001,21(3):6-11.

  [31]Y.L.Abdel-Magid,M.M.Dawoud.OptimalAGCTuningwithGeneticAlgorithms[J].ElectricPowerSystemResearch,1996,38(3):231-238.

  [32]C.S.Chang,WeihuiFu.AreaLoadFrequencyControlusingFuzzyGainSchedulingofPIControllers[J].ElectricPowerSystemResearch,1997,42:145-152.

  [33]HShayeghi,H.A.Shayanfar.ApplicationofANNTechniqueBasedonμ-synthesistoLoadFrequencyControlofInterconnectedPowerSystem[J].ElectricalPowerandEnergySystems2006,28:503-511.

  [34]张步涵,邵剑,吴小珊,王魁.基于场景树和机会约束规划的含风电场电力系统机组组合[J].电力系统保护与控制,2013,41(1):127-135.

  [35]Shamshad,M.Bawadi,W.W.Hussin,T.Majid,andS.Sanusi.FirstandsecondorderMarkovchainmodelsforsyntheticgenerationofwindspeedtimeseries[J].Energy,2005,30:693–708.

  [36]KevinBrokish,JamesKirtley.PitfallsofModelingWindPowerUsingMarkovChains[C].PowerSystemsConferenceandExposition,2009,PSCE'09.IEEE/PES,1-6.

  [37]F.O.Hocaoglu,O.N.GerekandM.Kurban.TheEffectofMarkovChainStateSizeforSyntheticWindSpeedGeneration[C].ProbabilisticMethodsAppliedtoPowerSystems,2008,PMAPS'08.Proceedingsofthe10thInternationalConference,1-4.

  [38]Dupacova,Growe-KuskaJ,RomischNW.Scenarioreductioninstochasticprogramming:anapproachusingprobabilitymetrics[J].MathematicalProgramming,2003,95:493-511.

  [39]HolgerHeitsch,WernerRomisch.Scenarioreductionalgorithmsinstochasticprogramming[J].ComputationalOptimizationandApplications,2003,24:187-206.

  [40]刘宝碇,赵瑞清.不确定性规划及应用.北京:清华大学出版社,2003.

  参考文献二:

  [1]杨莳百,戴景宸,孙启宏.电力系统可靠性分析基础及应用.北京:水利电力出版社,1986

  [2]宁辽逸,吴文传,张伯明.电力系统运行风险评估中元件时变停运模型分析.电力系统自动化,2009,33(16):7-12

  [3]BILLITONR,ALLANRN.Reliabilityevaluationofengineeringsystems:conceptsandtechniques.NewYork,NY,USA:PlenumPress,1983

  [4]LiW.Riskassessmentofpowersystem:models,methods,andapplications.USAandCanada:IEEEPressandJohnWiley&Sons,Inc.,2005

  [5]郭永基.可靠性工程基础.北京:清华大学出版社,2002

  [6]IEEEStdC57.91-1995IEEEguideforloadingmineral-oil-immersedtransformers,1995

  [7]GB/T15164-94油浸式电力变压器负载导则,1994

  [8]国家电网公司.油浸式变压器(电抗器)状态评价导则.北京:国家电网公司,2008

  [9]PATHAKJ,JIANGY,HONAVARV,etal﹒Conditiondataaggregationwithapplicationtofailureratecalculationofpowertransformers//Proceedingsofthe9thInternationalConferenceonProbabilisticMethodsAppliedtoPowerSystems,June11-15,2006,Stockholm,Sweden:1-7

  [10]宁辽逸,吴文传,张伯明.运行风险评估中的变压器时变停运模型(一)基于运行工况的变压器内部潜伏性故障的故障率估计方法.电力系统自动化,2010,34(15):9-13,95

  [11]LiW.Incorporatingagingfailureinpowersystemreliabilityevaluation.IEEETransactionsonPowerSystems,2002,17(3):918-923

  [12]Jong-FilMoon,Jea-ChulKim,Hee-TaeLee,etal.Time-varyingfailurerateextractioninelectricPowerdistributionequipment.9thInternationalConferenceonProbabilisticMethodsAppliedtoPowerSystemsKTH,Stockholm,Sweden.June11-15,2006.5.20

  [13]M.Mirzaie,A.Gholami,F.Aminifar,R.Saeedfar.FailureanalysisandreliabilityevaluationofPowertransformers.JournalofElectricalsystems,2006,2(l):l-2

  [14]WilliamH.BartleyP.E.Analysisoftransformerfailures.InternationalAssociationofEngineeringInsures36thAnnualConference,Stockholm,Sweden,2003

  [15]W.H.Tang,Q.H.Wu,Z.J.Richardson.Equivalentheatcircuitbasedpowertransformerthermalmodel.IEEProceedingsElectricpowerApplications.2002,149(2):87-92

  [16]W.H.Tang,Q.H.Wu,Z.J.ASimplifiedTransformerThermalModelBasedonThermal-ElectricAnalogy.IEEETransactionsonPowerDelivery,2004,19(3):1112-1118

  [17]郭永基.中小容量电力变压器寿命评估的新方法.电力系统自动化,2001,25(21):38-41

  [18]王昌长,李福祺,高胜友.电力设备的在线监测与故障诊断.北京:清华大学出版社,2006

  [19]IEEEStandard346:Termsforreportingandanalyzingoutageofelectricaltransmissionanddistributionfacilitiesandinterruptionstocustomerservice.IEEE,Piscataway,NJ,1973

  [20]LiWY,ZhouJQ,XiongXF.Fuzzymodelsofoverheadpowerlineweather-relatedoutages.IEEETransactionsonPowerSystems,2008,23(3):1529-1531

  [21]GuptaS,PahwaA,ZhouYJ,etal.Anadaptivefuzzymodelforfailureratesofoverheaddistributionfeeders.ElectricPowerComponentsandSystems,2005,33:1175-1190

  [22]孙荣富,程林,孙元章.基于恶劣气候条件的停运率建模及电网充裕度评估.电力系统自动化,2009,33(13):7-12

  [23]BillintonR,AllanRN.Reliabilityevaluationofpowersystems.2nded.,NewYorkandLondon:PlenumPress,1996

  [24]BillintonR,JainAV.Unitderatinglevelsinspinningreservestudies.IEEETransactionsonPowerApparatusandSystems,1971,90(4):1677-1687

  [25]AllanRN,BillintonR,Abdel-GawadNMK.TheIEEEreliabilitytestsystem-extensionstoandevaluationofthegeneratingsystem.IEEETransactionsonPowerSystems,1986,1(4):1-7

  [26]SamaanN,SinghC.Geneticalgorithmsapproachfortheassessmentofcompositepowersystemreliabilityconsideringmulti-statecomponents.8thInternationalConferenceonProbabilisticMethodsAppliedtoPowerSystems,IowaStateUniversity,Ames,Iowa,Sep.12-16,2004

  [27]BhuiyanMR,AllanRN.Modelingmulti-stateproblemsinsequentialsimulationofpowersystemreliabilitystudies.IEEProceeding:Generation,TransmissionandDistribution,1995,142(4):343-349

  [28]BillintonR,LianG.Considerationofdependentoutageinsecurity-constrainedadequacyevaluationofcompositesystems.IEEProceedings:Generation,TransmissionandDistribution,1994,141(1):47-52

  [29]BillintonR,MedicherlaTKP,SachdevMS.Applicationofcommon-causeoutagemodelsincompositesystemreliabilityevaluation.IEEETransactiononPowerApparatusandSystems,1981,100(7):3648-3657

  [30]孙元章,程林,何剑.电力系统运行可靠性理论.北京:清华大学出版社,2012

  [31]孙元章,程林,刘海涛.基于实时运行状态的电力系统运行可靠性评估.电网技术,2005,29(15):6-12

  [32]SunY,ChengL,LiuH,etal.Powersystemoperationalreliabilityevaluationbasedonreal-timeoperatingstate.The7thInternationalPowerEngineeringConference,Singapore,Nov,29-Dec.2,2005

  [33]程林,何剑,孙元章.线路实时可靠性模型参数对电网运行可靠性评估的影响.电网技术,2006,30(13):8-13

  [34]HeJ,ChengL,SunY.Analysisofcomponents’reliabilitymodelingbasedonreal-timeoperatingconditions.InternationalConferenceonPowerSystemTechnology,Chongqing,China,Oct.2006

  [35]刘海涛,程林,孙元章,等.基于实时运行条件的元件停运因素分析与停运率建模.电力系统自动化,2007,31(7):6-11

  [36]HeJ,ChengL,SunY.Transformerreal-timereliabilitymodelbasedonoperatingconditions.JournalofZhejiangUniversity:SCIENCEA,2007,8(3):378-383

  [37]何剑,程林,孙元章,等.条件相依的输变电设备短期可靠性模型.中国电机工程学报,2009,29(7):39-46

  [38]HeJ,SunY,WangP,etal.Ahybridconditions-dependentoutagemodelofatransformerinreliabilityevaluation.IEEETransactionsonPowerDelivery,2009,24(4):2025-2033

  [39]何剑,程林,孙元章,等.计及天气预测的电力系统运行可靠性短期评估.电力系统保护与控制,2010,38(10):31-38,51

  [40]SunY,WangP,ChengL,etal.Operationalreliabilityassessmentofpowersystemsconsideringcondition-dependentfailurerate.IETGeneration,Transmission&Distribution,2010,4(1):60-72

  参考文献三:

  [1]周玮等,含风电场的电力系统动态经济调度.中国电机工程学报,2009,29(25):13-18.

  [2]陈海焱,陈金富与段献忠,含风电场电力系统经济调度的模糊建模及优化算法.电力系统自动化,2006,30(2):22-26.

  [3]PathomAttaviriyanupap,HiroyukiKita,EiichiTanaka,etal.AFuzzy-OptimizationApproachtoDynamicEconomicDispatchConsideringUncertainties.IEEETransactionsonPowerSystems,2004,12(3):1299-1307.

  [4]PathomAttaviriyanupap,HiroyukiKita,EiichiTanaka,etal.AHybridEPandSQPforDynamicEconomicDispatchWithNonsmoothFuelCostFunction.IEEETransactionsonPowerSystems,2002,17(2):411-416.

  [5]WUYa-li,XULi-qing.AnImprovedculturalparticleswarmoptimizationalgorithmbasedonfeedbackmechanismforeconomicloaddispatchproblems.InternationalConferenceonComputationalAspectsofSocialNetworks,2010.

  [6]XinMA,YongLIU.DynamicLoadEconomicDispatchinElectricityMarketUsingImprovedParticleSwarmOptimizationAlgorithm.InternationalConferenceonIntelligentComputationTechnologyandAutomation,2010.

  [7]YongqiangWang,JianzhongZhoua,WenXiao,etal.Economicloaddispatchofhydroelectricplantusingahybridparticleswarmoptimizationcombinedsimulationannealingalgorithm.SecondWRIGlobalCongressonIntelligentSystems,2010.

  [8]ShiLianjun,ZengMing,YanFan,etal.EconomicDispatchModelConsideringRandomnessandEnvironmentalBenefitsofWindPower.10Proceedingsofthe2010InternationalConferenceonElectricalandControlEngineering,Washington,DC,2010.

  [9]ChengYunzhi.Anewapproachforemissionsandsecurityconstrainedeconomicdispatch.Starkville,MS,USA,2010.

  [10]袁铁江等,大规模风电并网电力系统动态清洁经济优化调度的建模.中国电机工程学报,2010(31):7-13.

  [11]彭春华与孙惠娟,基于非劣排序微分进化的多目标优化发电调度.中国电机工程学报,2009(34):71-76.

  [12]谢国辉.绿色发电调度模式和模型研究.华北电力大学(北京),2010.

  [13]袁铁江等,电力市场环境下含风电机组的环境经济调度模型及其仿真.电网技术,2009(6):67-71.

  [14]吴栋梁等,电力市场环境下考虑风电预测误差的经济调度模型.电力系统自动化,2012(6):23-28.

  [15]谭伦农,张保会.市场环境下的事故备用容量[J].中国电机工程学报,2002,22(11),54-58

  [16]戴俊良.基于CR的电力市场应用研究.华北电力大学(北京),2008.

  [17]李利利等,月度安全约束机组组合建模及求解.电力系统自动化,2011(12):27-31.

  [18]杨争林与唐国庆,全周期变时段“三公”调度发电计划优化模型.电网技术,2011(2):132-136.

  [19]李利利等,均衡发电量调度模式下的SCED模型和算法.电力系统自动化,2010(15):23-27.

  [20]GuodongLiu,KevinTomsovic.Quantifyingspinningreserveinsystemswithsignificantwindpowerpenetration[J].IEEETransactionsonPowerSystems,2012,27(4):2385-2393.

  [21]葛炬,王飞,张粒子.含风电场电力系统旋转备用获取模型.电力系统自动化,2010(6):32-36.

  [22]李霞,刘俊勇,刘友波,等.计及调度一致性的含风电系统备用优化分配.电力系统自动化,2013.

  [23]王丹平,陈之栩,涂孟夫,等.考虑大规模风电接入的备用容量计算.电力系统自动化,2012(21):24-28.

  [24]夏澍,周明,李庚银.考虑线路安全校核的含风电电力系统有功和备用协调调度.中国电机工程学报,2013(13):18-26.

  [25]SenjyuT,ShimabukuroK,UezatoK,FunabshiT.Afasttechniqueforunitcommitmentproblembyextendedprioritylist[J].IEEETransactionsonPowerSystems,2003,12:882-888.

  [26]SnyderWL,DpowellH,RayburnC.Dynamicprogrammingapproachtounitcommitment[J].IEEETransactionsonPowerSystems,1987,2(2):339-350.

  [27]Weerakorn,Ongsakul,NitP.Unitcommitmentbyenhancedadaptivelagrangianrelaxation[J].IEEETransactionsonPowerSystems,2004,19(2):620-628.

  [28]JusteKA,KttaH,TanakaE,etal.Anevolutionaryprogrammingsolutiontotheunitcommitmentproblem[J].IEEETransactionsonPowerSystems,1999,14(23):1452-1459.

  [29]张小平,陈朝晖.基于内点法的安全约束经济调度[J].电力系统自动化,1997,21(6):27-54.

  [30]郭志东,徐国禹.用二次规划法解算互联系统经济调度[J].电力系统自动化,1998,22(1):40-44.

  [31]MotaPP,QuintanaVH.APenaltyfunctionlinearprogrammingmethodforsolvingpowersystemconstraintedeconomicoperationproblems[J].IEEETransactionsonPowerAppatatusandSystems,1984,103(6):1414-1442.

  [32]HanXS,GooiHB,KirschenDS.Dynamiceconomicdispatch:feasibleandoptimalsolutions[J].IEEETransonPowerSystems,2001,16(1):22-28.

  [33]石立宝,徐国禹.遗传算法在有功安全经济调度中的应用[J].电力系统自动化,1997,21(6):42-44.

  [34]侯云鹤等,改进粒子群算法及其在电力系统经济负荷分配中的应用.中国电机工程学报,2004(7):99-104.

  [35]侯云鹤等,基于广义蚁群算法的电力系统经济负荷分配.中国电机工程学报,2003(3):59-64.

  [36]多目标混合进化算法及其在经济调度中的应用[J].电力系统自动化,2007,19(2):66-72.

  [37]WangS,BaranME.Reliabilityassessmentofpowersystemswithwindpowergeneration[C].PowerandEnergySocietyGeneralMeeting,Minneapolis,MN,2010.

  [38]张宏宇等,大规模风电接入后的系统调峰充裕性评估.中国电机工程学报,2011(22):26-31.

  [39]戴俊良等,基于基尼系数的电力调度公平性指标探讨.电力系统自动化,2008(2):26-29.

  [40]魏学好,胡朝阳与杨莉,对“三公”调度现有评价指标的思考和建议.电力系统自动化,2012(20):109-112.